INOX Chairside 3D Printer
INOX
A resin 3D printer sized to stand in the clinic, not only in a lab. It closes a loop: intraoral scan, design, print — a splint, a model, a surgical guide or a temporary restoration — the same day, with nothing sent out. The touchscreen runs the job from the machine itself, and the hood filters light so the resin does not cure before its time. Installed by JK Dent, with staff training and ongoing service.
- Supply, installation and staff training by JK Dent
- Full warranty
- Service and maintenance — response within 24 hours
More in this category
HeyMill W19Five-axis wet milling machine for hard materials: grade-5 titanium, cobalt-chrome, glass-ceramics and polymers. Two spindle modes — quick and high-power — move it between fine finishing and metal cutting on the same machine. It takes round discs, blocks and pre-milled titanium columns, and is aimed at angled multi-unit abutments and precision screw-retained work. JK Dent installs it in the lab, trains the team and services it.
HeyMill D18Five-axis dry milling machine with no compressor — the lab needs no compressed-air infrastructure. A 60,000 rpm spindle, an automatic ten-bur changer and milling accuracy down to one micron. It monitors bur life, alarms on breakage, and resumes from the breakpoint after an interruption, so a whole disc is not lost mid-job. JK Dent installs it in the lab, trains the team and services it.
W16Five-axis hybrid milling machine — wet and dry in one unit, so a single lab covers zirconia, wax, resin, glass-ceramics, titanium, pre-milled blanks and soft metals without splitting the work between two machines. High-power water-cooled spindle, tool-life monitoring and job recovery after a power cut. Compatible with mainstream CAM systems. Supply, installation, staff training and maintenance by JK Dent.
HeyTemp TSTS-series zirconia sintering furnace with high-purity Elema heating elements. It pre-dries the restoration and clears residual moisture before the sintering cycle, so no preheating is needed and work can go straight in. Fast and slow sintering are combined; in fast mode — with silicon-carbide heating rods — sintering time drops to about an hour. Up to 150 units per cycle, with no metal-ion contamination. Supply, installation, staff training and maintenance by JK Dent.
Contact us
A site visit, measurements and an initial plan with a price range — no obligation.
Leave a detailed message
Even outside business hours — we will get back to you.